Large two-level composite deck with wide stairs, built-in bench and an outdoor dining area

5.0 on Google · Snohomish County pricing, 2026

What a composite deck really costs in Snohomish County (2026)

A new TimberTech composite deck runs $70–95 per sq ft installed around Everett and Snohomish County — framing, decking, railing and stairs included. Priced line by line from our own jobs, not national averages.

WA Lic. GPGENGC830KD · James Hardie Select Contractor · 5-year workmanship warranty · Permits pulled at cost

★ 5.0 on Google — 30 reviews

What Homeowners Say

Real reviews from our Google profile — unedited, from real projects.

★★★★★

“We recently had Paul with GP General repair a damaged corner protector and sidings. His estimate was reasonable, his availability was timely, and his job was excellent. Our home hadn’t been re-painted in a while and the paint had considerably faded, yet he was able to match the color perfectly. Now we know who to turn to when in need of another repair work.”

Daigoro T.
Google review · Aug 2026
★★★★★

“GP General replaced LP siding on our garage. Paul was very thorough when he came out to do the estimate; he listened to my concerns and was able to work out solutions on the spot. His crew did a great job and were very courteous. They also were careful about cleaning up (I didn’t find any nails!). Really happy with the job and can recommend GP General.”

Richard H.
Google review · Aug 2026
★★★★★

“I highly recommend GP General Corp for siding replacement. We recently had our wood siding replaced with James Hardie lap siding, and Paul and his team did an excellent job.”

Yevhenii
Google review · Jul 2026

The numbers

Installed cost per square foot

All-in pricing for Snohomish County, from takeoffs priced board-by-board against our Dunn Lumber supplier account — not scraped national averages.

New composite deck boards being installed over an existing deck frame

Re-deck a sound frame

$55–75

per sq ft installed

New composite surface, fascia and railing over your verified-sound structure.

Most common
Ground-level composite deck with a contrasting picture-frame border on a modern home

New TimberTech deck

$70–95

per sq ft installed

Engineered PT framing, footings, TimberTech PRO decking with hidden fasteners, standard railing, a stair run, permits at cost.

Elevated second-story composite deck with heavy posts, a beam and switchback stairs

Elevated / structural

$95–125+

per sq ft installed

Second-story or walkout decks, engineered beams and glulams, new footings, ledger remediation, shear elements per stamped plans.

Deck demolitionWhen replacing: tear-off, haul-off, disposal fees
$5–8/sf
Cedar railing optionMaterials: 2×6 cap, 2×4 rails, 2×2 balusters, 4×4 posts
$28–30/lf

National cost sites quote $40–$80/sf for composite. The honest reason our floor is higher: those averages mix slab-level Sun Belt decks into wet-climate, engineered, permitted Puget Sound work — and our numbers include the railing, the stairs, and the ledger flashing done right.

By deck size

Sample project totals

Walk-out height decks with one stair run and standard railing. Elevated structure, long stair runs, premium railing (cable, glass) and PVC boards move totals up; simple grade-level platforms come in under the ranges.

12 × 12

144 sq ft

$11,000–15,000

typical installed total

16 × 16

256 sq ft

$18,000–24,500

typical installed total

14 × 20

280 sq ft

$20,000–27,000

typical installed total

20 × 20

400 sq ft

$28,000–38,000

typical installed total

Real example · elevated structural rebuild · 371 sq ft

Engineered beams, six new footings, stairs, patio and ledger remediation — priced from the stamped plan set.

≈ $43,000about $115 per sq ft
Composite deck stairs with LED riser lights at dusk

Free on-site assessment

Want your deck’s real number?

Free on-site assessment, free written line-item quote, and a free rendering of the proposed deck on your actual house — anywhere from Everett to Arlington.

Photos of the area (optional)

No spam, no pressure. Paul responds personally within 24 hours — or call/text (425) 344-9635.

Open book

Where the money actually goes

No other deck company around here will show you this, so we will. On a recent 371 sq ft engineered rebuild, the materials — priced from our actual Dunn Lumber supplier account — were about half the job; skilled labor and demolition were the other half.

  • Composite decking≈ 930 lf at ~$6.50/lf
  • Hidden fasteners4 boxes
  • Composite fascia & stair risersper plan
  • PT 2×10 joists, 6×10 beams, glulamengineered
  • Posts, hangers, hold-down hardwareper plan
  • Concrete: six footings + slab 
  • Cedar railing stock~70 lf

When a bid is dramatically cheaper, one of those halves is getting shorted — and it’s never the half you can see from the driveway.

Composite decking, framing lumber and hardware staged for a deck build

Every GP deck quote is a written line-item document

  • Demo, structure, surface, railing, stairs — each priced on its own line
  • Permit fees passed through at cost
  • A contingency allowance for hidden rot stated in dollars — the unused portion credited back

No deposit until materials hit your driveway

We bill 30/50/20 as the work lands — so you’re never paying far ahead of the job.

The long game

Composite vs cedar decking: the 15-year math

15 years of deck upkeep: cedar vs composite A cedar deck surface needs restaining every two to three years, while a composite deck needs only washing. The cedar finish costs catch up with the composite price premium around year 8 to 12. Year 051015 Finish bills catch the composite premium: year 8–12 Cedar deck restain every 2–3 yrs $$$$$$ Composite deck soap and water No staining, ever
Cedar deckRestain every 2–3 years at $6–10 per sq ft — roughly 5–7 finish cycles over 15 years
Composite deckSoap and water — no staining, ever

Finish bills catch the composite premium around year 8–12.

Cedar decking costs less on day one — but a horizontal cedar surface in Puget Sound wants restaining every 2–3 years (walls get 3–7; decks lie flat under the rain and the foot traffic). At $6–10 per square foot per cycle, a cedar deck’s finish bills catch the composite premium within about a decade, and composite never asks for a weekend of your summer.

It’s the same time-cost logic we published for siding in our 10 & 20-year siding cost guide — upfront price is half the number. We still love cedar where it belongs: on railings, where it’s vertical, touchable, and easy to refresh.

Permits

Permit costs & the 30-inch rule

Snohomish County: no permit only if the deck is under 30″ above grade, freestanding, and not serving an exit door — everything else is reviewed under the 2021 code via MyBuildingPermit.com. The City of Everett runs its own desk with similar thresholds.

  • Permit fees: typically a few hundred to ~$1,500, depending on valuation
  • Structural rebuilds need stamped engineering — usually $1,500–$3,000 to the engineer
  • Guardrails become code above 30″
  • We coordinate all of it and pass the permit through at cost
Deck plan set with a tape measure and speed square on a workbench

Common questions

Deck cost — FAQ

How much does a 20×20 composite deck cost?

In Snohomish County, plan on $28,000–$38,000 installed for a 400 sq ft TimberTech deck with framing, standard railing, and a stair run. Elevated or engineered versions run more; a grade-level platform runs less.

What does composite decking cost per square foot installed?

All-in — structure, surface, railing, stairs — $70–$95/sf for a typical new deck here, $95–$125+ elevated/structural, $55–$75 for re-decking a sound frame. Material-only numbers you see online ($15–25/sf) are just the boards, not a deck.

Is composite cheaper than wood over time?

Usually, yes. Cedar decking saves roughly $10–15/sf upfront but wants restaining every 2–3 years on a horizontal surface in this climate; by year 8–12 the finish bills have eaten the difference, and composite keeps paying you back for decades after.

How much does deck demolition cost?

$5–$8 per square foot to tear off, haul, and dump a typical deck — more if the frame is bolted into odd places or access is tight. On rebuilds we fold demo into the single line-item quote so you see the whole number at once.

Why do deck quotes vary so much?

Because they’re rarely quoting the same deck. The spread usually hides in what’s excluded: railing, stairs, footings sized for our soil, ledger flashing, permit fees, disposal. Our quotes are line-item complete with a stated rot-contingency allowance — the number you sign is the number you pay unless we open the wall and find surprises, which the allowance already covers.

Do you charge for the estimate?

No — the on-site assessment and the written line-item quote are free anywhere in Snohomish County, and we include a photorealistic rendering of the proposed deck on your actual house so you can see it before you spend a dollar.