
5.0 on Google · Mukilteo, WA
Deck Builder in Mukilteo, WA
View decks built for salt air and wind — TimberTech composite, marine-grade stainless hardware and cable or glass railing that keeps Possession Sound in sight. Old Town to Harbour Pointe, minutes from our Everett shop.
WA Lic. GPGENGC830KD · James Hardie Select Contractor · 5-year workmanship warranty · Permits pulled at cost
What Homeowners Say
Real reviews from our Google profile — unedited, from real projects.
“We recently had Paul with GP General repair a damaged corner protector and sidings. His estimate was reasonable, his availability was timely, and his job was excellent. Our home hadn’t been re-painted in a while and the paint had considerably faded, yet he was able to match the color perfectly. Now we know who to turn to when in need of another repair work.”
“GP General replaced LP siding on our garage. Paul was very thorough when he came out to do the estimate; he listened to my concerns and was able to work out solutions on the spot. His crew did a great job and were very courteous. They also were careful about cleaning up (I didn’t find any nails!). Really happy with the job and can recommend GP General.”
“I highly recommend GP General Corp for siding replacement. We recently had our wood siding replaced with James Hardie lap siding, and Paul and his team did an excellent job.”
Salt & wind
What salt air does to an ordinary deck
Galvanized hardware that lasts decades inland pits and streaks within a few years over salt water. On Mukilteo’s beach and bluff homes we build decks the way we build saltfront walls: stainless steel fasteners and connectors where weather reaches, corrosion-rated post hardware, and TimberTech’s fully-capped boards that don’t care about salt fog the way stained wood does.
Bluff-top sites add wind: guardrails and stair rails get engineered connections, not just code-minimum nailing, because a 40-knot southerly finds every shortcut. It’s the same marine discipline behind our Mukilteo siding work — decks just put it horizontal.

Don’t fence the ferry
Railings that keep the view
A Mukilteo deck exists for the view — Possession Sound, the ferry lanes, Whidbey sunsets — so the railing decision matters more here than anywhere. All three are detailed for 36″ code height with engineered posts, and we bring samples to your actual deck.

Stainless cable
The view-keeper, salt-rated by nature. Wants re-tensioning every few years.

Glass panels
Maximum view plus a windbreak on exposed bluffs. Wants regular washing in salt air.

Cedar
Warm and traditional, view-tolerant with a slim top rail. Wants oil now and then.

Free on-site assessment
Free assessment, Old Town to Harbour Pointe
Railing samples in hand, a written line-item quote, and a free rendering of the deck — and the view — from your actual house.
Scope & numbers
Rebuilds, view decks & what they cost
Most Mukilteo projects are rebuilds — a 90s cedar deck that’s fed the moss long enough — and elevated view decks off main-floor living rooms. Cable and glass railing price by the foot above cedar.
A typical 300 sq ft elevated TimberTech deck with cable railing lands roughly $30,000–$40,000 installed.

Common questions
Mukilteo decks — FAQ
Do waterfront decks really need stainless hardware?
Within salt-fog reach of the Sound, yes — galvanized coatings pit and bleed rust streaks down fascia within a few seasons. Stainless fasteners and connectors cost a 10–15% premium on the hardware lines and remove the problem for decades. Inland Mukilteo (Harbour Pointe uplands, 525 corridor) can run standard coated hardware honestly.
Which railing is best for a view deck?
Stainless cable if you want near-invisibility with marine-grade durability; glass if you want a wind-break and don’t mind squeegee duty; cedar with a slim profile if warmth matters more than the last few degrees of sightline. All three meet the 36″ guardrail code. We bring samples to the assessment and mock up heights on site.
Can you rebuild a deck on a bluff-top house?
Yes — elevated and slope-adjacent decks are engineered projects: proper footings, sometimes stamped structural plans, wind-detailed rails. We coordinate the engineering, pull the City of Mukilteo permit at cost, and build from the plans. Environmentally critical bluff areas add review time; we’ve navigated it on siding projects for years.
How much does a Mukilteo view deck cost?
A typical 300 sq ft elevated TimberTech deck with cable railing lands roughly $30,000–$40,000 installed; simpler walk-out decks with cedar rail start in the low $20s. Salt-exposed sites carry the marine-hardware premium. Free written line-item quote — and a free rendering of the deck on your house — after a site visit.
Keep exploring
More from GP Decks

Edmonds view decks
Composite decks for the Bowl and the view streets, with glass or cable railing.
Edmonds decks
What a deck really costs
Size-by-size totals and a real line-item takeoff from a Snohomish County rebuild.
Deck costs
Everett deck builder
Rebuilds, new composite decks and railings — built by the crew that keeps walls dry.
Deck overview