Raised composite deck with black aluminum railing and wide stairs on a gray craftsman-style home in a Pacific Northwest neighborhood

5.0 on Google · Everett & Snohomish County

Deck Builder in Everett, WA

TimberTech composite decks, rebuilds and railings — built by the exterior crew that keeps Snohomish County walls dry. Typically $70–95 per sq ft installed.

WA Lic. GPGENGC830KD · James Hardie Select Contractor · 5-year workmanship warranty · Permits pulled at cost

★ 5.0 on Google — 30 reviews

What Homeowners Say

Real reviews from our Google profile — unedited, from real projects.

★★★★★

“We recently had Paul with GP General repair a damaged corner protector and sidings. His estimate was reasonable, his availability was timely, and his job was excellent. Our home hadn’t been re-painted in a while and the paint had considerably faded, yet he was able to match the color perfectly. Now we know who to turn to when in need of another repair work.”

Daigoro T.
Google review · Aug 2026
★★★★★

“GP General replaced LP siding on our garage. Paul was very thorough when he came out to do the estimate; he listened to my concerns and was able to work out solutions on the spot. His crew did a great job and were very courteous. They also were careful about cleaning up (I didn’t find any nails!). Really happy with the job and can recommend GP General.”

Richard H.
Google review · Aug 2026
★★★★★

“I highly recommend GP General Corp for siding replacement. We recently had our wood siding replaced with James Hardie lap siding, and Paul and his team did an excellent job.”

Yevhenii
Google review · Jul 2026

Why GP for decks

Decks built by the crew that keeps walls dry

A new deck should add years to your house, not quietly subtract them. We’re an Everett exterior contractor first — siding, flashing, water management — so we build decks the way we build walls: drainage-first, flashed, and documented.

Then we finish them in TimberTech composite that won’t splinter, rot, or ask for a weekend of staining every other summer.

Weathered wood deck with moss, a loose railing and a water-stained ledger pulling away from the houseTypical tired wood deck
Rebuilt composite deck with black aluminum railing against new gray lap sidingComposite rebuild

What we build

Deck work around Everett

From tear-off rebuilds to second-story decks, every project gets the same standard details: flashing-taped ledger and joists, proper post bases (never buried posts), stainless or coated fasteners, and our 20-point final walkthrough.

Deck rebuild in progress with a new flashed ledger, joist hangers and butyl tape on the joists

Deck rebuilds

Tear off the failing deck, fix what it did to the house, rebuild in composite. Our most common deck job — and the one where siding expertise matters most.

Ground-level composite deck with a contrasting picture-frame border on a modern home

New composite decks

Engineered framing, TimberTech surfaces, hidden fasteners, stairs and landings — built to the plan set when there is one, built like there is one when there isn’t.

Elevated second-story composite deck with heavy posts, a beam and switchback stairs

Elevated & structural

Second-story and walkout decks, structural posts and beams, engineered footings. We work from stamped plans and pull the permits.

New composite deck boards being installed over an existing deck frame

Re-decking

Sound frame, tired surface: new composite decking and railings over your existing structure — the budget path to a new-deck feel.

Composite deck at dusk with string lights, a fire table and lit stair risers

Free on-site assessment

Get a real deck number, not a teaser

Free on-site assessment anywhere in Snohomish County: a written line-item quote, honest re-deck vs. rebuild advice, and a free photorealistic rendering of the deck on your actual house.

Photos of the area (optional)

No spam, no pressure. Paul responds personally within 24 hours — or call/text (425) 344-9635.

Choosing boards

Composite, PVC or wood? How they compare here

We install TimberTech PRO capped composite — the sweet spot for Puget Sound — and TimberTech’s Advanced PVC line where budgets allow, over engineered pressure-treated framing with hidden fasteners. Weighing brands too? Read our honest TimberTech vs Trex comparison.

TimberTech PROCapped composite · our standardTimberTech Advanced PVCPremium PVC · the AZEK lineCedar or pressure-treatedTraditional wood
CoreWood fiber and polymer, sealed in a protective capFully synthetic PVC — no wood fiber to absorb waterNatural lumber; open grain takes on water
Warranty25–30 year product and fade & stain coverage, by collectionLifetime limited product + 50-year fade & stainRarely backed long-term
Wet-climate durabilityVery good — the cap keeps water out of the coreBest — nothing organic to rotNeeds sealing; shade and moss shorten its life
UpkeepSoap and water, no stainingSoap and water, no stainingRestain a flat deck every 2–3 years
Heat underfootAverage — lighter colors stay coolerSelect colors engineered to run coolerVaries by species and stain color
Installed with GP$70–95/sf typical new deck, all-inPremium board — priced above compositeLower day-one cost, higher upkeep over time

Warranty terms summarize TimberTech’s published limited warranties; we confirm the exact collection at your assessment.

One family, one crew

James Hardie now owns TimberTech. We install both.

In July 2025, James Hardie — the company behind the siding we install every day — completed its acquisition of AZEK, the maker of TimberTech decking. Your walls and your deck now come from the same manufacturer family.

As a James Hardie Select Contractor who installs TimberTech, we’re exactly the contractor that combination was built for: one crew, one accountability, one standard of installation across your whole exterior. (The two contractor programs are still separate — there’s no combined certification.)

Blue-gray fiber cement lap siding home with a matching composite deck and black railing
How a deck ledger should meet the house Cross-section: siding cut back above the ledger, sound sheathing, self-adhered membrane and metal flashing with a drip lapped under the house wrap, the ledger bolted through to the rim joist, joists hung in metal hangers with butyl tape on top, and composite decking with a gap at the wall. HOUSE DECK 1 2 3 4 5 6 Schematic — not to scale
How the ledger connection should be built — the detail behind most deck failures.

The detail that matters

Where most decks fail — and where we’re strongest

Most deck failures don’t start in the deck — they start at the ledger, where the deck bolts to your house. Building that connection right is siding work, and it’s the exact detail on every engineered deck plan we build from.

  1. 1Siding cut backSiding comes off where the ledger lands, so wood never traps water against the wall.
  2. 2Sheathing checked & replacedRotted sheathing behind an old ledger is cut out and replaced before anything bolts to it.
  3. 3Membrane + metal flashingSelf-adhered membrane behind the ledger and a drip-edge flashing over it, lapped under the house wrap.
  4. 4Ledger bolted to the rim joistFastened through to the house framing per the plan — never just nailed through siding.
  5. 5Hangers + joist tapeJoists hang in metal hangers, and butyl tape caps every joist top to keep the frame dry.
  6. 6TimberTech surfaceHidden fasteners, code-correct gapping, a clear gap at the wall and matching fascia.

Railings

Railings that fit the house — and the view

Guardrails are code above 30 inches, and they’re half the look of the deck. We build four ways, and bring samples to your assessment.

Site-built cedar deck railing with a wide cap and 2x2 balusters

Cedar

Our signature: real wood warmth, built on site with a wide cap — about $28–30 per linear foot in materials.

Stainless cable deck railing with black posts and a water view

Stainless cable

Cables nearly disappear — the view-keeper for water and mountain decks, marine-rated by nature.

Frameless glass deck railing on a composite deck with a water view

Glass panels

The cleanest sightline plus a windbreak on exposed decks. Wants the occasional wash.

Black aluminum baluster railing on a gray composite deck

Aluminum & composite

Clean, low-maintenance railing systems in black or white that pair naturally with composite boards.

Straight numbers

What a deck costs here

Honest, all-in numbers from our actual jobs — framing, decking, standard railing and stairs — not teaser rates that grow later.

Re-deck

$55–75

per sq ft installed

New composite decking, fascia and railing over a frame we’ve verified is sound.

Most common

New composite deck

$70–95

per sq ft installed

Engineered framing and footings, TimberTech decking with hidden fasteners, standard railing and a stair run.

Elevated & structural

$95–125+

per sq ft installed

Second-story and walkout decks, beams and footings per stamped plans, ledger remediation.

A 20×20 (400 sq ft) TimberTech deck typically lands between $28,000 and $38,000 installed. Permits are passed through at cost.

Real GP work

Walls and deck, one crew

On this Wallingford home addition we built the whole exterior: James Hardie lap siding, WindsorONE trim, and a TimberTech composite porch deck and stairs with white railings — the same crew, start to finish.

TimberTech composite porch deck and stairs with white railings on a Wallingford, Seattle home addition built by GP General CorpReal GP project · Wallingford, Seattle

Paperwork

Permits, handled at cost

In unincorporated Snohomish County, a deck needs a permit unless it’s under 30 inches above grade, freestanding, and not serving an exit door; the City of Everett runs its own permit desk with similar thresholds.

  • Anything with guardrails (required above 30″) or a ledger connection is permit territory
  • Reviewed under the 2021 residential code
  • We coordinate drawings and pull the permit — the fee is a pass-through line, never marked up

Where we build

Deck service across Snohomish County

Based on Olympic Drive in Everett, with view-deck specialists for the waterfront towns.

  • Everett
  • Mukilteo
  • Edmonds
  • Marysville
  • Lake Stevens
  • Snohomish
  • Mill Creek
  • Lynnwood
  • Monroe
  • Arlington

Already know our siding work? Same crews, same standards — see our Everett siding page and project portfolio.

Common questions

Everett deck building — FAQ

How much does a 20×20 deck cost in the Everett area?

A 400 sq ft TimberTech composite deck typically lands between $28,000 and $38,000 installed — framing, decking, standard railing, and a stair run included. Elevated or structural versions run more. Size-by-size numbers are on our deck cost page.

Do I need a permit to build a deck in Washington state?

Usually yes. In Snohomish County a deck escapes permitting only if it’s under 30 inches above grade, freestanding from the house, and not serving an exit door. Attached decks, decks with guardrails, and rebuilds with structural work are permit projects — we pull the permit at cost as part of the job.

Should I repair my deck or rebuild it?

The honest test is the frame: if the ledger, posts, and joists are sound, new decking and railings (re-decking) buys you a new deck feel at $55–75/sf. If there’s rot at the ledger or in the posts — which is where decks usually fail — a rebuild is the responsible call, because surface boards over a failing frame are cosmetics on a safety problem. We tell you which one you need at the free assessment, and we’re equipped for either.

Why TimberTech instead of Trex?

Both are quality products. We standardized on TimberTech for Puget Sound because its better lines cap the board on all four sides — meaningful in a climate with 37 inches of sideways rain — and because James Hardie now owns TimberTech, which puts your deck and your siding in the same manufacturer family. Full comparison here.

How long does a deck build take?

A straightforward re-deck runs about a week. A full rebuild with new footings, framing, and stairs typically runs 2–3 weeks on site, plus permit review time before we start. Weather matters less than you’d think — composite installs fine in Puget Sound winters, which is also when our schedule is most flexible.

Do you build the railing too?

Always — guardrails are code above 30 inches and they’re half the look of the deck. Cedar is our signature (real wood, built on site, $28–30/lf in materials), and we also install composite and aluminum railing systems and cable or glass railing where a view deserves to stay visible.